Toggle navigation
Home
BIM
Dictionaries
About
masterarbeit ghostwriter
Dictionaries
Benefits
Asset management labour utilisation savings
Better change management
Better cost accounting
Better data/information capturing
Better environmental performance
Better programming/scheduling
Better scenario and alternatives analysis
Better space management
Better use of supply chain knowledge
Competitive advantage gain
Faster regulation and requirement compliance
Fewer errors
Higher customer satisfaction
Higher process automation
Improved communications
Improved coordination
Improved data and information management
Improved documentation quality and processes
Improved efficiency
Improved information exchange
Improved learning curve
Improved output quality
Improved productivity
Improved safety
Less rework
Lower cost
More accurate quantity take-off
More effective emergency management
Optimisation of construction sequence
Reduced execution times and lead times
Reduced risk
Enablers
3D control and planning
3D laser scanning
Asset (preventative) maintenance scheduling
Asset knowledge management
Asset performance modelling, analysis and display
Augmented reality (AR)
Automated clash detection
Automated rule checking
BIM-based asset management system
Code validation
Common data protocol and environments
Constructability analysis
Construction system design (virtual mock-up)
Cost estimation (quantity take-off)
Cost planning (5D)
Data-rich, geometrically accurate model components
Design authoring (3D visualisation)
Design reviews
Digital fabrication
Disaster planning and response/disaster analysis software
Drawing generation
Early engagement of stakeholders
Energy simulation and analysis tools
Engineering analysis
Field and management tracking
Front-end planning
GIS-BIM
Hand-held devices
Information delivery manuals (IDMs)
Integrated model and program management systems
Interoperable formats
Lean construction
Object libraries
Online collaboration and project management
Open data exchange format
Phase planning (4D modelling)
Photogrammetry
Record modelling
RFID
Site analysis
Site coordination models
Site utilisation planning
Space management and tracking
Streamlined logistics
Sustainability evaluation
Virtual walk-through and animations
Well-structured data
Metrics
Access to market
Accuracy and number of errors/ omissions
Asset/equipment useful life
Carbon footprint
Clashes
Conflict
Contingency cost
Cost of change
Cost per defects-warranty
Cost per unit
Cost predictability
Cost recovery (decommissioning)
Cost savings/avoidance
Emergency latency
Emergency plan and response effectiveness
Field material delivery
Fire safety
Globalisation
Knowledge management metrics
Labour intensity
Latency
Learning curve
Meeting agenda appropriateness
Meeting effectiveness
Meeting efficiency
Model (or drawing) coordination consistency
Off-site manufacturing
Overall cost
Overall time
Profit
Program capacity
Quality
Request for information
Resource use and management
Risk
Safety metrics
Satisfaction
Schedule conformance
Speed of production
Stakeholder involvement
Stand-by and idle time
Sustainability and environmental performance scores
Time for change
Time per unit
Time predictability
Time required to access information during emergency drills and events
Variations and change orders
Visualisation
Volume of Rework
×